| First grid connection of the KKR | May 5, 1966 |
| First grid connection of unit 1 of the KGR | December 17, 1973 |
| Commissioning of units 2, 3, 4 | 1974 / 1978 / 1979 |
| Starting the trial run of unit 5 | 1989 |
| Shut down (step by step) | 1990 |
| Reactor type KKR | Pressurized water reactor (PWR), type WWER-70 |
| Reaktor type of the units 1-4 | Pressurized water reactor, type WWER 440/W-230 |
| Reaktor type of unit 5 | Pressurized water reactor, type WWER 440/W-213 |
| Electrical power of each unit (KGR) | 440 MW |
| Total gross electricity generation | > 148 000 GWh |
| Share of the electricity generation of the former GDR | ~ 11 % |
| Main equipment supplier | Atomenergoexport (former Soviet Union) |
| Main contractor | Kombinat Kraftwerksanlagenbau Berlin |
| Operator | Kombinat Kernkraftwerke "Bruno Leuschner" Greifswald |