The Dismantling

In April 1995 the responsible nuclear authority, the Ministry for Environment, Environmental Protection and Environmental Planning of the Land of Brandenburg issued the license for the decommissioning and partial dismantling of the Rheinsberg NPP. Based on this and other licenses the following activities were executed:

Secondary Circuit

From July 1995 until December 1997 the secondary circuit in the turbine hall and centre building was dismantled.

Click to enlarge
General view on the turbine and generators
Click to enlarge
Turbine ? Disassembling of the low pressure rotor
Click to enlarge
Generator ? Taking out the inductor
Click to enlarge
Dismantling the turbine foundation

Primary Circuit

During May 1997 until August 1998 the main equipment of the primary circuit (steam generator and main circulation pump including pipelines and steal constructions) was dismantled. Until 2002 the dismantling of primary circuit auxiliary systems followed (for example closed air cooling system, additional make-up system, and intermediate cooling circuit).

Click to enlarge
Disassembling a steam generator
Click to enlarge
Steam generator in 40-feet container

Click to enlarge
Steam generator at the cutting place

Back to top

Click to enlarge
Dismantling a gas decay tank
Click to enlarge
Gas decay tank at the cutting place


Click to enlarge
Disassembling the pump casing of a main coolant pump